Cost Centers (Detail): Target/Actual - SituationTechnical name: 0CCA_C11_Q006
If you want to modify this query, note the special features of the 0CCA_C11 CO-OM-CCA: Costs and Allocations InfoCube
This query is a regular report for the cost center manager. It provides an overview of the following costs incurred on a cost center:
Planned, actual and target costs in the current period of the current fiscal year with their variances
Actual and target costs cumulated up to the current period of the current fiscal year with their variances
Note
This query is contained in the Cost Center (Detail): Target/Actual - Situation workbook
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
|
0COSTCENTER |
Cost center (entry optional, variable 0S_CCTR) |
InfoObject |
Description |
0COSTELEMNT |
InfoObject |
Description |
Previous period and cumulated up to current period (Use of the Situation - Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual Costs |
Target |
Target Costs |
Variance (%) |
Percentage variance between actual and target costs (actual - target) / target |
The
target costs, actual costs
and
variance
key figures are displayed for the previous period and in cumulated form up to the current period.