Cost Center (Detail): Actual/Plan – SituationTechnical name: 0CCA_C11_Q0002
If you want to modify this query, note the special features of the 0CCA_C11 InfoCube: CO-OM-CCA: Costs and Allocations
This query is a regular report for the cost center manager. It provides an overview by cost element of the actual and planned costs incurred on a cost center for the current fiscal year, cumulated up to the current fiscal year, and projected based on the cumulated actual costs.
Note
This query is contained in the Cost Center (Detail): Plan/Actual - Situation workbook
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
|
0COSTCENTER |
Cost center (entry optional, variable 0S_CCTR) |
InfoObject |
Description |
0COSTELEMNT |
InfoObject |
Description |
Previous period and cumulated up to current period (Use of the Situation - Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual costs |
Plan |
Planned costs |
Variance (%) |
Percentage variance between actual costs and planned costs (actual - plan) / plan |
Projection |
Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year |
Planned costs |
Planned costs from all periods in the current fiscal year |
Variance (%) |
Percentage variance between the projected actual costs and planned costs (actual - plan) / plan |
The
Planned costs, actual costs
and
variance
key figures are always displayed for the previous period and displayed as cumulated up to the current period of the current fiscal year.