 Cost Center (Detail): Actual/Plan – Situation

Technical name: 0CCA_C11_Q0002

If you want to modify this query, note the special features of the 0CCA_C11 InfoCube: CO-OM-CCA: Costs and Allocations

Use

This query is a regular report for the cost center manager. It provides an overview by cost element of the actual and planned costs incurred on a cost center for the current fiscal year, cumulated up to the current fiscal year, and projected based on the cumulated actual costs.

Note Note

This query is contained in the Cost Center (Detail): Plan/Actual - Situation workbook

End of the note.

For background information on the concept of queries, see Queries in Controlling .

Filters

InfoObject

Description

0CO_AREA

Controlling area (variable 0P_COAR; single value entry, required)

0CURTYPE

Currency type (fixed value 10, company code currency)

0FISCVARNT

Fiscal year variant (SAP exit variable 0P_FVAEX)

0COSTCENTER

Cost center (entry optional, variable 0S_CCTR)

Rows

InfoObject

Description

0COSTELEMNT

Cost element

Columns

InfoObject

Description

Previous period and cumulated up to current period

(Use of the Situation - Current Period structure)

Values from the previous period and the cumulated values up to the current period

Actual

Actual costs

Plan

Planned costs

Variance (%)

Percentage variance between actual costs and planned costs (actual - plan) / plan

Projection

Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year

Planned costs

Planned costs from all periods in the current fiscal year

Variance (%)

Percentage variance between the projected actual costs and planned costs (actual - plan) / plan

The Planned costs, actual costs and variance key figures are always displayed for the previous period and displayed as cumulated up to the current period of the current fiscal year.