Master Data Setup for Safety Stock Planning
The following documentation describes which specific master data you have to define for safety stock planning within the replenishment planning process of the SAP Supply Network Collaboration (SAP SNC).
Determine whether you want to use standard or extended safety stock planning.
If you use standard safety stock planning, enter the relevant data
in the following fields on the Lot Size
tab
page in the location product master:
Safety Stock Method
- Method SB
, SZ
,
or SM
Safety Stock
- is considered by the
system if you choose safety stock method SB
Safety Days' Supply
- is considered
by the system if you choose safety stock method SZ
The system considers the maximum safety stocks derived from Safety
Stock
and Safety Days' Supply
if
you choose safety stock method SM
.
If you use extended safety stock planning, enter the relevant data
in the following fields on the Lot Size
tab
page in the location product master:
Safety Stock Method
- Methods AT,
AS, BT
or BS
.
Service Level (%)
Target Days' Supply
- During safety
stock methods AT
and BT
the
system interprets this value as an order cycle. During safety stock method BS
the
system uses this value to calculate the purchase order quantity.