CO-PC: Product Cost Planning – All Cost Estimates
Technical name: 0COPC_C08
Use
This InfoCube contains the values of the cost components of the cost component split for all existing material cost estimates, broken down into fixed/variable costs, level/lower-level costs, and costing date.

In this InfoCube, you can compare different cost estimates for a given material that were created for different purposes (with different costing variants). If you want to analyze the standard prices of materials, SAP recommends you use InfoCube
For background information on the concept of InfoCubes, see
InfoCubes in Controlling.
Prerequisites in the SAP R/3 System
You have created cost estimates.
Higher-Level Objects
Roles
This InfoCube provides information on the following subject:
SAP_BWC_CO_PROD_COST_PLANNING:
Product Cost PlanningQueries
The following queries can access this InfoCube:
0COPC_C08_Q0001:
Cost Estimate: Overview, All Cost Estimates for a Material0COPC_C08_Q0002:
Cost Estimate: Detailed Report, Cost Component Split0COPC_C08_Q0003:
Cost Estimate: Detailed Report, Fixed and Variable Costs0COPC_C08_Q0004:
Cost Estimate: Detailed Report, Level/Lower Level CostsNotes on Query Definition
To select materials of a particular group in the queries and workbooks, such as material group, division, profit center and so on, you can use all of the navigation attributes of the characteristic
material. To do this you must activate the navigation attributes to this InfoCube if you have not already done so (see under Activated Navigation Attributes).Calculating sums across different values of the following characteristics does not serve any useful purpose:
InfoSources
0CO_PC_PCP_01:
Product Cost Planning: All Cost EstimatesLoading Behavior

SAP recommends loading an InfoPackage (by particular characteristics, such as the plant) after completing and checking the cost estimate. This has the advantage that you do not need to delete as much data when you reload. InfoPackages that are already complete can be retained.
Characteristics
InfoObject |
Description |
0COMP_CODE |
Company code |
0PLANT |
Plant |
0MATERIAL |
Material number |
0COSTVAR |
Costing variant |
0COSTVERS |
Costing version |
0COSTSTATUS |
Costing status |
0COSTDATE |
Costing date |
0CCOMPVIEW |
Cost component view |
0CCOMPTYPE |
Type of cost component split |
0CCOMPSTRUC |
Cost component structure |
0COSTCOMP |
Cost component |
0CLEVEL_IND |
Indicator level/lower level |
0WITHQTYSTR |
With quantity structure |
0CURTYPE |
Currency type |
0VALUATION |
Valuation view |
0MAT_PLANT |
Plant material |
0CCOMP_HLP |
Input characteristic (do not use in queries) |
0MAT_PLANT
(plant material) is a purely technical characteristic that is linked to 0PLANT. This enables the attributes of 0MAT_PLANT (such as profit center) to be used in queries.0CCOMP_HLP is linked to the characteristics cost component structure, cost component, and level/lower level indicator. This enables exception aggregation across all characteristics (rather than just one of these characteristics) for the key figures lot size and planned production quantity. Exception aggregation is required because these key figures are contained in all data records for a cost estimate. That is, when summing across all cost components, for example, these key figures (which are contained in the data records for each cost component) would also be summed. Exception aggregation prevents this summation of the key figures.

Do not use this characteristic in queries.
0COSTDATE (costing date) and 0CALDAY (calendar day) both contain the costing date. If you want to have this shown in the query under Costing date, use 0COSTDATE.
Time Characteristics
InfoObject |
Description |
0CALDAY |
Calendar day |
Key Figures
InfoObject |
Description |
0LOTSIZE_CM |
Lot size |
0PRDPLN_QTY |
Planned production quantity |
0AMOUNTFX |
Fixed amount |
0AMOUNTVR |
Variable amount |
Calculated Key Figures
InfoObject |
Description |
Formula |
0COPC_C08_CK001 |
Amount |
Fixed amount +
Variable amount |
Units
InfoObject |
Description |
0UNIT |
Unit of measure |
0CURRENCY |
Currency key |
Activated Navigation Attributes
A number of navigation attributes were activated as an example. You are free to activate additional attributes, or deactivate attributes to improve performance.
InfoObject |
Description |
0COSTCOMP__0CCOMPGRP_1 |
Cost component group 1 |
0COSTCOMP__0CCOMPGRP_2 |
Cost component group 2 |
0MATERIAL__0DIVISION |
Division |
0MATERIAL__0MATL_GROUP |
Material group |
0MATERIAL__0MATL_TYPE |
Material type |
0MATERIAL__0PROD_HIER |
Product hierarchy |
0MAT_PLANT__0CO_AREA |
Controlling area |
0MAT_PLANT__0PROFIT_CTR |
Profit center |