Performing Period-End Closing for Branches
With the multiple branches function, you need to perform period-end closing for each branch separately.
From the SAP Business One Main Menu
, choose .
In the Period-End Closing — Selection Criteria
window, define required selection criteria and settings.
Choose the Execute
pushbutton.
In the Period-End Closing
window, in the header area, from the Branch
dropdown list, select the branch for which you want to perform a period-end closing.
Specify other required information, select documents by selecting the Approved
checkboxes, and choose the Execute
pushbutton.