Procedure documentation Scheduling a Background Job  Locate the document in its SAP Library structure

Prerequisites

You have defined the required variant.

More information: Creating a Variant for Scheduling Background Jobs

Procedure

...

       1.      Log on to the SAP NetWeaver ASand start transaction SDOE_BG_JOB_MONITOR.

       2.      Expand the required job.

       3.      Double-click schedule job.

       4.      In the Job Name field, enter a name for the job.

       5.      Choose Schedule Job.

       6.      Select the required variant and choose This graphic is explained in the accompanying text Schedule.

       7.      Choose the required schedule.

Note

If you have not defined a variant, the system prompts you to create a variant. To do this, choose Create Variant.