
In addition to basic configuration templates, you can use the following templates:
Specific Scenarios
PI SLD Self Registration
This template registers PI components and creates the Integration Server business system again after patch update or restart, if needed.
More information about manual configuration: Configures the Integration Server and Business Systems in the SLD
PI Full Qualified Host Name
This template allows access to PI monitoring from a client outside your network domain or access to a remote central System Landscape Directory.
More information: SAP Note 1320707
PI SSO Configuration
This template allows you to set up Single Sign-On between the PI components.
More information about manual configuration: Single Sign-On Configuration
PI Demo Client
This template configures clients 105, 106, 107 for the PI demo scenario. This is not supported for systems upgraded from XI 3.0 or SAP NetWeaver 7.0.
More information about manual configuration: General Configuration Steps
Adapter Engine in JPR Mode
This template configures the Advanced Adapter Engine to run in Java Proxy Mode only.
More information about manual configuration: Integration Using the Java Proxy Runtime , section Running a Non-Central Adapter Engine in Java Proxy Mode
Robustness and Test
PI Robustness Configuration
This template reads PI system parameters from the system and offers recommendations for an overall consistent configuration of PI.
More information: SAP Note 1400543
PI Self Test for SAP NetWeaver
This template checks the PI configuration.
More information: SAP Note 1286149
PI Self Test for SAP NetWeaver Scheduler
This template creates a Java background job that calls the PI Self Test for SAP NetWeaver every 24 hours.
More information: SAP Note 1318609
Upgrade
PI Upgrade
This template executes some of the follow up activities automatically.
More information: SAP Note 1321868
PI Upgrade EHP
This template executes follow up activities automatically after applying an enhancement package.
More information: SAP Note 1450419
Adapter Engine Upgrade
The Adapter Engine must be installed with the PI Installer (SAPInst).
After an upgrade of a non-central Adapter Engine, this template creates the Java RFC Destination XI_EXCHANGE_PROFILE .
More information: SAP Note 1519075
PI PCK Upgrade
This template assigns PCK user roles, creates a JCo destination for the Exchange Profile and performs follow-up activities is the SLD.
More information: SAP Note 1439558