 Carry Out Automatic Kanban Calculation Locate this document in the navigation structure

  1. From the Kanban menu, choose   Control Cycle   Kanban Calculation   Create Proposal.  

    The initial screen of the report Create Change Proposal for Kanban Control Cycles appears.

  2. Enter the plant for which the calculation is to be carried out.

  3. Specify whether the kanban calculation is to be carried out with requirements from MRP or with simulative requirements from long-term planning . In the case of long-term planning, you must additionally specify the planning scenario .

  4. Define the period of examination.

  5. If necessary, enter the number of successive days which there are no requirements in the Ignore Days Without Requirements field. The system then does not take these days into account in the kanban calculation. See also: Ignoring Days Without Requirements

  6. Use the given criteria to limit the selection of the control cycles for which the calculation is to be carried out.

    If you do not specify any selection criteria, the system carries out the calculation for all control cycles of the specified plant for which a calculation has been definedl

  7. Choose Execute .

Result

Upon successful calculation, you get a success message showing the number of control cycles for which the calculation was carried out and the number of control cycles for which no calculation was carried out.