Show TOC

 Mass-Processing Functions for Production and Process Orders Locate this document in the navigation structure

The following options are available for process and production orders :

Confirmation

  • You will find information on entering confirmations against production and process orders under Entering Confirmations Against Production Orders

  • Information on entering confirmations against planned orders is available under Mass-Processing Functions for Planned Orders

    Material Availability Check (Also for Planned Orders)

    Parameters

    • Reset availability data

    • Scope of check (no check, individual check per material according to checking group, ATP check for all materials, check for all materials against preplanning)

    • Firm planned orders

    • Check log (no log, log as of information message, log as of warning message, log as of error message, log as of termination message)

    Time

    Execute function immediately, execute function in background, create function preselection

    Test

    No

Release

Parameters

When you release an order, you can decide whether just the order or the order network to which it belongs is to be released.

When you release an operation, you have the following options:

  • Release the order to which the operation belongs

  • Release the order network to which the operation belongs

  • Release an individual operation (all preceding operations or orders for direct-production assemblies must have been released)

  • Release an individual operation and all preceding operations (all preceding operations or orders for direct-production assemblies are released automatically at the same time)

Release control order (order release, order network release, release of first operation, release of first operation and dependent orders)

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

Printing of Shop Floor Papers

Parameters

  • Print mode:

    • Reprint for status PRT (printed) and PPRT (partially printed)

    • Original print for PPRT and not printed

  • Spool parameters ( order type, plant, MRP controller ); the selection of the lists for the parameters is made from print customizing. If you select  ( ) after entering spool parameters, the lists to be printed according to print customizing are displayed.

Time

Execute function immediately, execute function in background, create function preselection

Test

No

Costing

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

Scheduling

Parameters

It is possible to reschedule production or process orders. During forward or backward scheduling you can specify new basic dates or move the basic dates by a fixed time span. You can also have the dates determined by scheduling, get them from the sales order if available, or set them to the total commitment date. You can also change the scheduling type of the order.

In the order network, all the orders of the network are scheduled. The data entered relates to the leading order.

Rescheduling is subject to the normal restrictions on scheduling. For instance an order that has the status DLV (delivered) cannot be rescheduled.

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

Set Up Capacity Requirements

Parameters

In Customizing for the Availability Check , the generation of requirements can be switched off.

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

WM Material Staging

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

Picking

Parameters

  • Execute goods movements in dialog

  • Execute goods movements in batch

Time

Execute function with dialog

Test

No

Set/Delete User Status

Parameters

Header or operation

  • Status profile (must be identical in the order and in the mass processing function)

  • Status

  • Active/inactive

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

Technically Complete

Parameters

This parameter is only relevant if you are processing order networks.

In the latter case you can choose the following scope of processing:

  1. Order/Total Network

    The entire order network, including superordinate orders, is technically completed.

  2. Subnetwork

    The order itself and all hierarchically subordinate orders in the order network are technically completed.

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

Close

Time

Execute function immediately, execute function in background, create function preselection

Test

Yes

Log Display

Parameters

You can choose all other mass processing functions except for Log Display . If you do not choose any functions, all logs are selected.

Time

Execute function with dialog

Test

No