Procedure documentation Installing Equipment Without Simultaneous Material Movement  Locate the document in its SAP Library structure

Use

You want to install equipment in a superordinate piece of equipment or functional location without posting a goods issue.

Prerequisites

      Equipment must have a material number and serial number.

      Equipment must not be in stock.

Procedure

...

       1.      Choose Logistics Plant Maintenance Maintenance of Technical Objects Configuration Control Installation and Dismantling of Components from the SAP Easy Access screen.

       2.      In the mode list field, select Install Equipment Without Material Movement if the appropriate screen is not automatically displayed.

       3.      There are different options available for entering the required data:

                            a.      Enter either a piece of equipment or a material and a serial number in the Install Object group box.

       Enter a reference order, if required.

       Enter an installation location.

If the actual configuration of the object concerned is linked with its master parts list, you can choose Get Installation Location to have the system propose an installation location. This function is only active if the fields for the installation location are not filled.

                            b.      If you have maintained a master parts list for the object concerned, enter an installation location in the Installation Location group box, and choose Get Material to have the system generate a proposal for the material to be installed.

       Enter the serial number of the material that you want to install.

       Enter a reference order, if required.

       4.      If you want to simulate the installation before saving, choose This graphic is explained in the accompanying text Check. You can display the search result in a full screen application log. Choose This graphic is explained in the accompanying text Application Log to do this.

       5.      Save your entries.

You may have to activate the forced installation to override an error message issued by the system. In this case, choose This graphic is explained in the accompanying text Forced Installation/Dismantling and confirm the message in the following dialog box.

A forced installation is only possible after the simulation of the installation has taken place.

Result

      The equipment is installed in the superordinate object.

      If the corresponding Business Add-In is active, a notification is generated or updated.

      If you use the functions integrated in the Configuration Control Workbench, you may have installed the equipment in a structure gap. In this case, the structure gap is automatically deleted.

      If a forced installation was used to install the equipment, a corresponding indicator is set on the Configuration Control tab page in the equipment master record.

See also:

Installation of Components.