Show TOC Start of Content Area

Procedure documentation Goods Movement out of Stock Without PM Integration  Locate the document in its SAP Library structure

Use

You want to remove a material from stock and install it in a technical object but without updating the hierarchy of the technical object. You can do this with the Business Add-In (BAdI) BADI_CCM_FULLY_EQUI.

Prerequisite

You have actively implemented the BAdI BADI_CCM_I_STRCT_CHK.

Procedure

...

       1.      Choose Logistics Plant Maintenance Management of Technical Objects Configuration Control Installation and Dismantling of Components from the SAP Easy Access screen.

       2.      In the mode list field, select Goods Movement from Stock w/o PM Integration if the appropriate screen is not automatically displayed.

       3.      Enter a material and choose This graphic is explained in the accompanying text Enter.

       4.      Enter the required quantity, a plant, and a storage location.

       5.      Enter either a reservation or a movement type.  

Enter a reference order, if required.

       6.      If you want to simulate the installation before saving, choose This graphic is explained in the accompanying text Check. You can display a full screen application log. Choose This graphic is explained in the accompanying text Application Log to do this.

       7.      Save your entries.

Note

You may have to activate the forced installation to override an error message issued by the system. In this case, choose This graphic is explained in the accompanying text Forced Installation/Removal and confirm the message in the following dialog box.

A forced installation is only possible after the simulation of the installation has taken place.

Result

      The material is issued from the stock without updating the hierarchy of the technical object(s).

      If the corresponding BAdI is active, a notification is generated or updated.

See also:

Installation of Components

 

 

End of Content Area