Change Production
You use this activity to change the material, routing, bill of material (BOM), and/or shop order for one or more SFC numbers (see SFC Number).
This activity is typically used to resolve problems on the shop floor, or to reconfigure assemblies to meet new requirements such as a BOM or routing change.
Note
You cannot change production for an SFC number if it is a member of an SFC group with the status Group Created
or Sampling Active
(see Sampling). Also, you cannot change production on a relaxed routing when quantity of a non-serialized SFC is at more than one router step.
When Change Production
is used to change the routing for an SFC number, the system attempts to move the operation level claimed or awarded standards from the old routing to the new one. For more information, see Earned Standards.
You can use this activity for the following situations:
A computer has been partially built for one customer, but to complete a rush order, needs to be shipped to another customer. The computers have different BOM requirements; one computer requires 1 GB RAM, and the other requires 2 GB RAM. Run the Change Production
activity to switch the SFC number from one BOM to another to resolve this problem.
A new operation on the shop floor is introduced and all pieces of the material must now be processed through this operation. Run the Change Production
activity to change the routing and continue production.
For more information, see Changing Production.
The following table describes rules and settings that you can change for this activity in Activity Maintenance
:
Rule | Setting |
|---|---|
|
|
|
|
|
For more information, see Container Maintenance). Allows you to change the material, routing, BOM, or shop order for SFC numbers that are packed in a container where
|
|
|
|
|
|
|
|
|
The following tables describe fields requiring explanation:
Field | Description |
|---|---|
| The material to which you want to change the SFC numbers |
| The routing to which you want to change the SFC numbers |
| The source of the BOM ( |
| The BOM to which you want to change the SFC numbers |
| The shop order to which you want to change the SFC numbers Note that the |
| If selected, reduces the original shop order’s build quantity by the total SFC quantity moved to the new shop order |
Field | Description |
|---|---|
|
Note that if you attempt to perform a production change on an SFC number with an
|
Field | Description |
|---|---|
| The SFC numbers with a future hold operation that will be lost after the production change because the future hold operation does not exist on the new routing/version |
| The hold ID associated with the future hold operation |
| The future hold operation where the future hold association will be lost |
| The step ID associated with the future hold operation |
| Displays the comments entered when the future hold was assigned |