Allocating an Alternative Date
In the standard system, the valid-from date in the change header is automatically valid for all the change objects that are changed with reference to this change number.
However, you can replace this date with a special valid-from date for some change objects. You can do this, for example, if you want changes to a bill of material and to a routing that you make with reference to one change number to be effective from different dates.
If, for a particular change object (for example, bill of material), you want to replace the general valid-from date in the change header with another valid-from date, you assign one or more change objects to the alternative date.
You can only complete this function if object management records exist for the change objects concerned (for example, BOM, task list).
The system performs an object-specific date shift for the chosen objects. The same checks are made as for an ordinary date shift. For example, the system checks the control data settings in Customizing.
See also:
Protected Time PeriodIf it is not possible to shift the date for at least one BOM or task list without any restriction, you see a temporary log.
See also:
Entering Alternative Dates Date Shift for the Valid-From Date Special Features of Object TypesTo allocate a management record to an alternative date:
Ind. |
Indicator: Selected via object search |
Alloc |
Indicator: allocated to the alternative date displayed |
GenAll |
Indicator: allocated to an alternative date |
If the required change object does not have an object management record, you must create one first.