Procedure documentation Executing the Production Planning Run Online  Locate the document in its SAP Library structure

Use

You can execute the production planning run online immediately. However, you should only do this for small data quantities, for example if you want to execute planning for a few objects for test purposes.

Note

To prevent time-consuming jobs from adversely affecting the system response time in the interactive mode, the time for executing the report is limited. If a report runs for more than 5 minutes in the interactive mode, the system cancels the report automatically. You should therefore use background processing for extensive planning jobs.

Prerequisites

See Production Planning Run

Procedure

...

       1.      In the SAP Easy Access Menu, choose Production Planning Automated Production Planning and Optimization Production Planning Run.

       2.      Enter the necessary data for the global settings.

Note

If you want to use data that has already been saved as a variant, choose This graphic is explained in the accompanying text.

       3.      Enter the individual planning steps on the tab pages.

¡        You can either navigate between the individual planning steps using the tab pages, or you can display a list of the planning steps by choosing the button on the extreme right, and calling a planning step from the list.

¡        If you want to delete a planning step, choose This graphic is explained in the accompanying text Delete Contents of Planning Step, on the tab page of the planning step.

¡        For an overview of all planning steps that you have entered, choose This graphic is explained in the accompanying text Display Overview of Planning Steps.

¡        If you want to execute the production planning run at a later date using this data, use This graphic is explained in the accompanying text to save the current settings as variants.

       4.      Enter the planning objects (for example, resource or product) for a planning step, and confirm your entry.

Depending on the planning object in question, the system displays input fields for selecting the individual objects for the planning step.

       5.      Enter the objects that are to be processed.

Note

If you want to execute net change planning for a product using a PP heuristic, that is, if you only want to plan products with planning file entries, set the with planning file entry indicator.

       6.      Choose This graphic is explained in the accompanying text Execute.

Results

The system executes the production planning run immediately online.

 