Configuring a Process Integration Scenario 
You must configure the scenario before you can execute it.
This section contains an overview of the necessary configuration steps.
For detailed instructions of how to configure this process integration scenario (for the SAP standard configuration), see the separate configuration guide(see General Configuration Steps).
Before you configure this process integration scenario, you must execute general configuration steps (for example, set up the System Landscape Directory, generate the appropriate flight data).
Note that when configuring communication paths to the travel agency using IDocs that you first have to specify those IDocs. For more information, see the separate configuration guides.
More information: General Configuration Steps
You can use the model configurator for the whole configuration procedure.
Note information on this in the separate configuration guides for demo examples in the chapter Booking Connecting Flights (Proxy-to-Proxy/IDoc Communication).
For a detailed introduction to the configuration of the demo examples, see the SAP Developer Network (SDN) at . In the Knowledge Center on the Service Bus-Based Integration page choose Getting Started. On the Getting Started page, choose the SAP NetWeaver Process Integration Demo Examples - Configuration Guide.