Creating PLM Documents for a Master Contract This function is a method of business object PLM Document . The system carries out all the important business-related steps that need to be executed to successfully set locks on lockable objects in accordance with auditing requirements.
The prerequisites described in the PLM Document section must have been met and the listed settings made.
From the
SAP Easy Access
screen, choose
.
Enter the master contract pool to which the PLM document is to refer.
Enter the event type on which the PLM document is to be based, and choose
Continue
.
Note
You can select the event type by double-clicking the
Event Type Classes/Event Types
group box.
The system reads the event type and generates a view of the PLM document with the tab pages permitted by the event type Customizing.
Now edit the tab pages that are displayed.
A PLM document of the
Master Contract
document category can have the following tab pages that you can edit, depending on the
document status of the PLM document
and the
Business Workplace
indicator.
Save your entries.