Technical name: 0PP_C13
Use
This InfoCube is used for comparing the available capacity with the target capacity requirements for the operation segments Process, Setup and Teardown. In this process, the system tries to divide the target capacity requirements equally between the workdays, according to the factory calendar.
Before loading the transaction data, the factory calendar and the master data for the plant and work center must be transferred first.
Distribution between the corresponding workdays means that the target capacity requirements for the operation segments Process, Setup and Teardown are more exact than in the InfoCubes
0PP_C03 and 0PP_C04. Therefore, this InfoCube (0PP_C13) should be used for analyses of capacity load utilization. In addition, it only makes sense to load InfoSource 0PP_WCCP into this InfoCube (0PP_C13) for examining the capacity load utilization and no longer into InfoCubes 0PP_C03 and 0PP_C04.For more information, refer to
Special Features When Using PP-PI.
For this InfoCube, aggregates are provided in the Standard System via the following characteristics: Plant/Material/Component/Month and Plant/Work Center, Resource/Week. The aggregate via Plant/Work center, Resource/Week is not active because the time lost due to aggregation when filling the InfoCubes may be more than the time gained when carrying out the queries.

When filling this InfoCube from InfoSource

This InfoCube can be used as of Release 4.0B because the InfoSource
2LIS_04_P_ARBPL is not available until 4.0B.This InfoCube cannot be used if you have an R/3 Release prior to Release 4.0B. In this case, therefore, you can only carry out capacity analyses using InfoCubes
PP_C03 and 0PP_C04.Determining the Workdays
The factory calendar is used to determine the workdays (attribute of the work center and the plant). The factory calendar for the work center has priority. Week days are used if a factory calendar cannot be determined.
To determine the relevant workdays for each order, the following date fields are evaluated in the order: Earliest start date and Earliest finish date or Latest start date and Latest finish date.
When a factory calendar can be determined, the number of workdays between the Start and Finish dates are calculated and the capacity requirement is divided equally between the workdays.

If a factory calendar is assigned to a work center that has not yet been transferred, the update process is cancelled and a relevant message is issued.

If the factory calendar for a work center is subsequently changed, changes to orders that have already been loaded can lead to inconsistencies in the evaluations.
InfoSources
Characteristics
InfoObject |
Description |
0WORKCENTER |
Work center/resource |
0QUALIFIC |
Suitability |
0WAGEGR |
Wage group |
0MATERIAL |
Material number |
0PERSON |
Person |
0P_PLANT |
Planning plant |
0PRODORDER |
Manufacturing order |
0S_OPERAT |
Suboperation/Secondary resource |
0REASON_VAR |
Cause of the deviation |
0DOC_NUMBER |
Sales Document |
0OPERATION |
Operation/Phase number |
0PLANT |
Plant |
Time Characteristics
InfoObject |
Description |
0CALYEAR |
Calendar year |
0CALDAY |
Calendar day |
0CALMONTH |
Calendar year/month |
0CALQUARTER |
Calendar year/quarter |
0CALWEEK |
Calendar year/week |
Time characteristics 0CALMONTH, 0CALQUARTER and 0CALWEEK are determined from an automatic time conversion from 0CALDAY.
Key Figures
InfoObject |
Description |
0USINGTIME |
Operating time of the capacity |
0STANDCAP |
Available capacity |
0TGTTEARCAP |
Tear down target capacity requirement operation segment |
0TGTPROCCAP |
Process target capacity requirement operation segment |
0TGTSETPCAP |
Set up target capacity requirement operation segment |
Units
InfoObject |
Description |
0CAPA_UNIT |
Capacity unit requirement |