Period-Specific Operation/Work Center View 
Technical name: 0PP_C04
Use
This InfoCube contains all the production process transaction data related to order operations, uploaded from the source system(s). The process is mapped from the order start to the confirmation. Only actual data is displayed. However, as this is not to be compared with target data, it can be mapped for an exact period if the OLTP system is capable of this. The InfoCube is most suitable for period-specific quantity evaluations.
All durations are displayed as average per order, all quantities as sums.
You can find more information in
Special Features When Using PP-PI.
Aggregates are provided in the Standard System for this InfoCube via the following characteristics: Plant/Work Center, Resource/Month and Plant/Material/Work Center, Resource/Month.

When filling the InfoCube from InfoSource 0PP_WCCP you should note that, without the data on a time interval, only the capacity data of the current day is loaded.

If you have an R/3 Release from 4.0B onwards, SAP recommends that you use InfoCube
In addition, the capacity key figures in the 0PP_C03 and 0PP_C04 InfoCubes should no longer be used in queries. They should be replaced by the key figures in the new InfoCube 0PP_C13. In the InfoCubes 0PP_C03 and 0PP_C04, the capacities could not yet be divided between several days and have therefore always been posted to one day.
InfoSources
Characteristics
InfoObject |
Description |
0DOC_NUMBER |
Sales document |
0MATERIAL |
Material number |
0OPERATION |
Operation/phase number |
0PLANT |
Plant |
0PRODORDER |
Manufacturing order |
0P_PLANT |
Planning plant |
0S_OPERAT |
Suboperation/secondary resource |
0WORKCENTER |
Work center/resource |
0PERSON |
Person |
0QUALIFIC |
Suitability |
0REASON_VAR |
Cause of the deviation |
0WAGEGR |
Wage group |
Time Characteristics
InfoObject |
Description |
0CALYEAR |
Calendar year |
0CALDAY |
Calendar day |
0CALMONTH |
Calendar year/month |
0CALQUARTER |
Calendar year/quarter |
0CALWEEK |
Calendar year/week |
Time characteristics 0CALMONTH, 0CALQUARTER and 0CALWEEK are determined from an automatic time conversion from 0CALDAY.
Key Figures
InfoObject |
Description |
0ACTEXECTM |
Actual execution time (in days) |
0ACTLEADTM |
Actual lead time (in days) |
0CONFRM_QTY |
Actual quantity operation (business transaction) |
0CONF_SCRAP |
Actual scrap quantity operation |
0DEL_LOT_SZ |
Actual business transaction operations |
0TGTPROCCAP |
Process target capacity requirement operation segment |
0TGTSETPCAP |
Set up target capacity requirement operation segment |
0TGTTEARCAP |
Teardown target capacity requirement operation segment |
0STANDCAP |
Available capacity |
0USINGTIME |
Operating time of the capacity |
0ACTEXECTM |
Actual execution time (exact) |
0ACTLEADTMX |
Actual lead time (exact) |
0ACTPROCTME |
Actual processing time |
0ACTSETUPTM |
Actual setup time |
0ACTTEARDWN |
Actual teardown time |
0CONF_ACT1 |
Actual activity, activity type 1 |
0CONF_ACT2 |
Actual activity, activity type 2 |
0CONF_ACT3 |
Actual activity, activity type 3 |
0CONF_ACT4 |
Actual activity, activity type 4 |
0CONF_ACT5 |
Actual activity, activity type 5 |
0CONF_ACT6 |
Actual activity, activity type 6 |
Units
InfoObject |
Description |
0WM_UOT |
WM time unit |
0OPER_UNIT |
Operation units |
0CAPA_UNIT |
Capacity requirement unit |
0EXECT_UNIT |
Unit execution time (exact) |
0PROC_UNIT |
Unit processing time |
0SETUP_UNIT |
Unit setup time |
0TEARD_UNIT |
Unit teardown time |
0ACT1_UNIT |
Unit of measurement for the 1st activity to be confirmed |
0ACT2_UNIT |
Unit of measurement for the 2nd activity to be confirmed |
0ACT3_UNIT |
Unit of measurement for the 3rd activity to be confirmed |
0ACT4_UNIT |
Unit of measurement for the 4th activity to be confirmed |
0ACT5_UNIT |
Unit of measurement for the 5th activity to be confirmed |
0ACT6_UNIT |
Unit of measurement for the 6th activity to be confirmed |