Creating Value Schedules
You define value schedules as part of the discount premium quality schedules (DPQS) master data. Then when you create a commodity contract, you assign the appropriate DPQS value schedule to it.
You have authorization to create value schedules.
You have maintained the calculation rules and derived rules in Customizing for Logistics - General
under .
You have created volume schedules (see Creating Volume Schedules).
Note
It is mandatory to assign a volume schedule to a value schedule. Therefore, a volume schedule for the material must already exist.
If required, you have created global derived characteristics (see Creating Global Derived Characteristics).
On the SAP Easy Access
screen, choose .
Double-click the Maintain Value Schedule
node.
In the List of Schedules
screen area, choose
(Create Schedule
).
In the Header Information
screen area, enter the required data and press Enter.
The possible characteristics for the material are displayed on the Characteristic
tab page in the DPQS
Characteristic
screen area.
On the Characteristic
tab page in the DPQS Characteristic
screen area, select any unwanted characteristics and choose
(Delete
Row
).
Enter the required data for the remaining characteristics, and press Enter.
To enter the range values for a characteristic, double-click the relevant characteristic row.
The DPQS Characteristic Range List
screen area appears.
On the Characteristic Range
tab page in the DPQS Characteristic Range List
screen area, choose
(Insert Row
)
.
Enter the required data and press Enter.
You can enter as many rows as you require to specify the necessary ranges. The ranges you enter should cover all possible values between 0% and 100%, and specify whether matching loads should be accepted or rejected.
Save your entries.
Optionally, you can use this procedure to adjust the order in which the system evaluates each characteristic.
In the DPQS Characteristic
screen area, choose the Characteristic Sequence
tab page.
Select the characteristic you want to move.
Choose one of the following options:
(Sel. Field(s) Up
): moves the selected characteristic up
(Sel. Field(s) Down
): moves the selected characteristic down
(Sel. Fields to Start
): moves the selected characteristic to the top
(Sel. Fields to End
): moves the selected characteristic to the bottom
Save your entries.
To create a copy of an existing schedule, in the List of Schedules
screen area, select the schedule you want to copy and choose
(Copy Schedule
).
You can test new value schedules using the simulation function. For more information, see Simulating Value Schedules.
Before you can assign a value schedule to a commodity contract, you must set its status to Released
. For more information, see Setting the Status of Value Schedules.