Show TOC

Procedure documentationCreating LDC Objects (Mass Maintenance for Planned Contracts)

Procedure

To create an LDC object for a planned contract using the mass-maintenance method (that is, the method you use when entering weight/analysis/event details for more than one LDC event with common data), complete the following steps:

  1. Complete steps 1 to 5 as detailed in the documentation for creating an LDC object using the direct entry method.

  2. Select the LDC objects and choose Mass Maintenance (Mass Maintenance) for Event Details. Enter the data that is common for all of the selected LDC objects in the Event Details tab page. Choose Save (Save).

  3. Next, choose Mass Maintenance (Mass Maintenance) for Weights Details. Select, from the dropdown list, the certificate category, unit of measure, gross weight, and any other data common for all selected LDC objects. Check the data, and choose Save (Save).

  4. Next, choose Mass Maintenance (Mass Maintenance) for Analysis Details. Select, from the dropdown list, the certificate category, analysis type, dispute status, and any other data common for all selected LDC objects. Check the data, and choose Save (Save).

  5. To release the LDC object, click Back . The object status flag turns to green, with the status 03: Released. Choose Save (Save). The object is now released to the Orchestration Framework for further processing.