Cost Center (Range): Plan/Actual - Situation
Technical name: 0CCA_C11_Q0060
If you want to modify this query, note the special features of the 0CCA_C11
CO-OM-CCA: Costs and Allocations InfoCubeUse
This query is a regular report for the area manager. It provides an overview of the following costs incurred in a cost center range:

This query is contained in the
For background information on the concept of queries, see
Queries in Controlling.Filters
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
Fiscal year variant (SAP exit variable 0P_FVAEX) |
User-Defined Characteristics
InfoObject |
Description |
0COSTELEMNT |
Cost element (variable 0N_COEL, 0H_COEL) |
Rows
InfoObject |
Description |
0COSTCENTER |
Cost center (variable 0N_CCTR, 0H_CCTR) |
Columns
InfoObject |
Description |
Previous period and cumulated up to current period (Use of the Situation - Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual costs in current fiscal year |
Plan |
Planned costs in current fiscal year |
Variance (%) |
Percentage variance between actual and planned costs in the current fiscal year (actual - plan) / plan |
Actual projection |
Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year |
Planned Costs |
Planned costs from all periods in the current fiscal year |
Variance (%) (projection) |
Percentage variance between projected actual costs and planned costs (actual - plan) / plan |
The Planned costs, actual costs and variance key figures are always displayed for the previous period and displayed as cumulated up to the current period of the current fiscal year.
Report/Report Interface
You can go from this query to the next related one.
Query |
Description |
0CCA_C11_Q0002 |
Cost Center (Detail): Actual/Plan – Situation |