Cost Center (Detail): Actual/Plan – Situation
Technical name: 0CCA_C11_Q0002
If you want to modify this query, note the special features of the 0CCA_C11 InfoCube:
CO-OM-CCA: Costs and AllocationsUse
This query is a regular report for the cost center manager. It provides an overview by cost element of the actual and planned costs incurred on a cost center for the current fiscal year, cumulated up to the current fiscal year, and projected based on the cumulated actual costs.

This query is contained in the
For background information on the concept of queries, see
Queries in Controlling.Filters
|
InfoObject |
Description |
|
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
|
0CURTYPE |
Currency type (fixed value 10, company code currency) |
|
0FISCVARNT |
Fiscal year variant (SAP exit variable 0P_FVAEX) |
|
0COSTCENTER |
Cost center (entry optional, variable 0S_CCTR) |
Rows
|
InfoObject |
Description |
|
0COSTELEMNT |
Cost element |
Columns
|
InfoObject |
Description |
|
Previous period and cumulated up to current period (Use of the Situation - Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
|
Actual |
Actual costs |
|
Plan |
Planned costs |
|
Variance (%) |
Percentage variance between actual costs and planned costs (actual - plan) / plan |
|
Projection |
Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year |
|
Planned costs |
Planned costs from all periods in the current fiscal year |
|
Variance (%) |
Percentage variance between the projected actual costs and planned costs (actual - plan) / plan |
The Planned costs, actual costs and variance key figures are always displayed for the previous period and displayed as cumulated up to the current period of the current fiscal year.