Inicio del área de contenido

Procedimiento Posting a Material Withdrawal Localizar documento en árbol de navegación

Use

You may have used material during an activity for which you are entering working times. By branching directly to the Materials Management (MM) component, you can post a material withdrawal. You can only do this if your enterprise implements MM.

Atención

The time sheet data and the data on the material withdrawal are not saved together. If you do not save the data entered in the time sheet, or even if you delete it, the data entered on the material withdrawal is not affected.

Procedure

  1. Call the data entry view for CATS classic.
  2. Enter your data as usual.
  3. Choose Environment ® Material withdrawal.
  4. Also, you can create wage types which your employees can use to enter monetary amounts, for example an "expenses" wage type. Employees could use this wage type to enter amounts they unexpectedly had to spend on purchasing materials (cable, screws, and so on). The Initial Screen appears. You can enter all data relating to the material withdrawal on this screen.

    Nota

    For more information on material withdrawals, see Goods Issue.

  5. Este gráfico es explicado en el texto respectivo Save your entries.

The screen for maintaining the time sheet reappears. The system issues a message at the foot of the entry screen specifying the document number that has been created.

Result

You have entered information on a material withdrawal in addition to time sheet data.

 

 

Fin del área de contenido