Entering content frameProcedure documentation Changing a Rollover Table Locate the document in its SAP Library structure

Procedure

  1. Choose Position Management ® Rollover ® Table ® Change.
  2. Enter the Company code, Table ID, Table version and Version number of the table you want to change.
  3. Choose Enter.
  4. You can change the name of the table, the dates for the effective period and the reservation period of the table.
    1. The effective period tells you how long a table is valid for.
    2. The reservation period tells you the date by which an offer has to be returned.
  5. To enter the condition data, choose Variants.
  6. The rest of the procedure is the same as for creating a table.

  7. To enter the modification data, choose Modifications.
  8. The rest of the procedure is the same as for creating a table.

  9. Save your entries.

 

 

 

Leaving content frame