Prerequisites
See the Prerequisites section under
Import: Process.Procedure
The Import Property Tree: Parameters screen appears.
/USR/SAP/SH1/SYS/GLOBAL/TREE.DAT
The SAP System checks the transfer file and lists all value assignment types in the transfer file.
To correct the transfer file, choose Data transfer ® Download file in the Product Safety menu. Make the changes in an ASCII editor and then choose Data transfer ® Upload file.
A list is displayed showing you the differences in the value assignment types (for example, different descriptions) and characteristics.
A dialog box appears in which you can set the start date. After you have saved your data, the SAP System starts the data transfer for the start date specified.
To check the procedure, choose Data transfer ® Check transfer ® Property tree in the Product Safety menu.
Then choose , select the log for your transfer file, and choose Job log. The system generates a list of all messages for the background job.
Evaluate the messages and make the necessary corrections.
Result
See also:
Property Tree Import