
Processing Inspection Operations
Use
You use inspection operations to describe individual inspection steps in an inspection plan and to define the work center and the default values for an inspection.
Prerequisites
Procedure
Field |
What You Should Know |
Operation ID |
You can enter an operation ID. The operation ID must contain at least one non-numerical character. If you do not enter an operation ID, the system generates one automatically. An operation ID generated by the system only contains numerical values. After you have created an operation you can no longer change its operation ID. |
Operation |
You define the operation number used for determining the order of the operations. You can overwrite the proposed value. |
| Work center/Plant |
You define the place where the inspection is to take place or the person responsible for carrying out the inspection. You can overwrite the proposed entry for the plant. |
Control key |
The control key defines the business relevance of the operation. Make sure that the Inspection characteristics indicator is set in Customizing. |
Standard text key |
The standard text key provides a default for the description of an operation. This key simplifies data entry. |
Short text |
You enter a describing short text for the operation. |
Long text |
You enter a describing long text for the operation. |
Recording view |
You enter the recording view that is to appear when you confirm inspection results. |
Insp.pointCompletion |
You enter the reference and the type of valuation for the inspection point. If you have defined inspection points in the task list header, this is a required entry. You can overwrite the proposed entry. |
Base quantity |
You define the base quantity for the material to be manufactured. The default values for the operation relate to this quantity. You can overwrite the proposed value. |
Operation unit |
You define the unit for the material to be manufactured. You can overwrite the proposed value. |
Convert units of measure |
You define, how to convert the units for the material defined in the task list header into the operation units. |
The system writes all the data of your worklist to the database.

The authorization for entering data at operation level is controlled by the authorization object for the characteristics contained in the task list.
Additional Functions on the Operations Overview Screen
Function |
Pushbutton/Menu Path |
What You Should Know |
Creating operation |
Create p ushbutton |
You can create a new operation. |
Changing operation |
Change/Lock p ushbutton |
You read the selected operation data from the database into your worklist and therefore protect this data from being accessed by other users. |
Displaying operation |
Display/Unlock pushbutton |
You write the selected operation data from the your worklist to the database and therefore unlock this data for access by other users. |
Copying operation |
Copy pushbutton |
You can copy the operation data to use it in a different operation. |
Multi-level copying of operation |
Multi-level copy pushbutton |
You can copy the operation data to use it in a different operation. All objects belonging to this operation (for example, PRTs, inspection characteristics) are also copied. |
Deleting an operation |
Delete pushbutton |
You can delete the selected operations. All objects belonging to this operation (for example, PRTs, inspection characteristics) are also deleted. |
Referencing a reference operation set |
Create reference to reference op. set pushbutton |
When you create an inspection operation, you can reference one or several reference operation set(s). |
Referencing a work center operation set |
Create reference to work center op. set pushbutton |
When you create an inspection operation, you can reference one or several work center operation set(s). |
Printing task list |
|
You can print the task list. |
Switch to the first operation |
First record pushbutton |
If you selected several operations, you switch to the first operation, which was selected. |
Switch to the previous operation |
Previous record pushbutton |
If you selected several operations, you switch to the previous operation, which was selected. |
Switch to the next operation |
Next record pushbutton |
If you selected several operations, you switch to the next operation, which was selected. |
Switch to the last operation |
Last record pushbutton |
If you selected several operations, you switch to the last operation, which was selected. |
Assigning materials to the task list |
Task Lists ® Material-task list assignments |
You go to the material-task list assignment, where you can assing one or several material(s) to the task list. |
Switch to the task list header overview screen |
Task Lists ® Headers |
You switch to the task list header overview. |
Switch to the production resources and tools overview screen |
Task Lists ® Production resources and tools |
You switch to the production resources and tools overview screen. |
Switch to the inspection characteristics overview screen |
Task Lists ® Inspection characteristics |
You switch to the inspection characteristics overview. |
Switch to the dependent characteristic specifications overview screen |
Task Lists ® Dependent characteristic specifications |
You switch to the dependent characteristic specifications overview screen, where you can assign customer-, vendor- and/or material-specific inspection specifications to an inspection characteristic. |
Displaying detail screen |
Goto ® Details |
You switch to the detail screen of the selected operation(s). |
Displaying key date |
Extras ® Key date |
You can display the key date and change it, if necessary. |
Displaying change number |
Extras ® C hange number |
You can display the change number and change it, if necessary. |
Displaying effectivity parameters |
Extras ® Effectivity parameters |
You can display the effectivity parameters and change them, if necessary. |
Displaying selection criteria |
Extras ® Selection criteria details |
You can display the chosen selection criteria. |
Displaying work area |
Extras ® Working area details |
You can display the chosen working area. |
Updating mass changes |
Extras ® Mass changes |
In all selected operations you can replace your data with different values. |