Entering content frameProcedure documentationAssigning Work Centers Locate the document in its SAP Library structure

Use

If you assign a particular work center to an inspection operation, you can confirm the activities performed in the inspection operation. The appraisal costs are determined in the Controlling (CO) application component with the help of the confirmed activity times.

Prerequisites

For you to be able to confirm the activities for an inspection operation, the following conditions must be fulfilled:

Procedure

  1. In the operation overview, enter a control key for the inspection operation. This key is configured in Customizing as follows:
  1. Enter a work center for the operation on the Operations general tab page.

On the Processing time tab page additional data fields are displayed in the screen section Standard values.

  1. Enter the following data in the additional fields, as required:

Result

You can record and settle the costs incurred in the inspection.

See also:

Structure link Quality-Related Costs

 

 