
Creating a Costing Run
Use
The costing run enables you to simultaneously cost and analyze multiple materials, and update them in the material master. The first step in creating the costing run is establishing the general data.
Procedure
Without Reference
The Edit Costing Run screen appears.
.The Create Costing Run screen appears.
The costing variant also determines whether the costing results can be written to the material master record. For more information, see Preparing for Material Costing.
If
costing across company codes has been activated in Customizing for Product Cost Planning, you can transfer existing cost estimates from other company codes within the active controlling area.
The transfer control ID is proposed from the costing variant. The costing variant also specifies whether the transfer control ID can be changed at this point. For more information, see
Use of Existing Costing Data.
.
The dates proposed are based on the date control and date of the costing run. However, you can still change the dates if the appropriate setting has been made in the date control.
to save the costing run.With Reference:
The Edit Costing Run screen appears.
With reference. The Create Costing Run screen appears.
.The system proposes the dates of the costing run reference in the tab pages Costing dates and Dates.
to save the costing run.Result
After you have saved the costing run, you can proceed with the step Processing in the order specified.
See also: