
Converting With Processing in the EWB
Use
Before you convert an iPPE product structure to a material BOM, you can process the objects that were converted successfully in the engineering workbench (EWB).
Prerequisites
In the
settings (settings tab page), you have set the Go to Processing indicator.Procedure
The system decomposes the product structure and determines the conversion-relevant iPPE objects. Depending on the data that is converted, you see a screen of the engineering workbench, such as EWB: BOM Header Overview.
Result
The system saves the iPPE data that has been extracted without errors (and changed in the engineering workbench) to the material BOM.