
Defining an Active Concept
Use
Engineering processes only use the data of an active concept. It is read in the following processes:

You can define one concept as the active concept.
When you create the first concept in a concept group, the first concept automatically becomes the active concept. Once you have added at least one more concept, you can define another concept as the active concept.
Prerequisites
You have maintained the product structure in the iPPE workbench. The product structure contains a component variant that has a concept group with at least two concepts.
See
Creating a Concept GroupProcedure
Start the iPPE workbench in change mode. Load the product structure, and display the Basic data 1 tab page for the component variant
.
The Concepts
tab page appears.
In the Active column, you select the concept whose data transfer you want to simulate or execute.
Result
You have defined the selected concept as the active concept. The product structure is automatically updated in the navigation area.
The concepts are shown with the following indicators:
Inactive concept
Active concept
The active concept is used in the following processes:

We recommend that you do not delete an active concept. If you delete an active concept, you see a warning message. In this case, define another concept as the active concept.