Entering content frameProcedure documentation Editing Variation Ranges in Report Painter Locate the document in its SAP Library structure

Use

You can edit variations of Report Painter reports in two ways:

Procedure

  1. On the selection screen, choose This graphic is explained in the accompanying text Variation.
  2. In the dialog box Additional Entries: Variation, choose the radio button for the required degree of explosion.

You can restrict the characteristic values further by assigning them from and to levels (variation range) using This graphic is explained in the accompanying text.

Entries possible for the from level of the variation range and the resulting restrictions for the to level

From level

To level

Positive [>0]

Greater/Less From level

Negative [-1; -2]

No entry

Example

The following example illustrates the variation range levels possible within a cost center hierarchy:

This graphic is explained in the accompanying text

For more information, see Working with Variation Ranges in Report Painter.