Show TOC
Improved Weekly Overtime Analysis
Scope of Functions
In time evaluation using the standard schema TM00, subschemas TOW1 and
TOW2 previously provided sample solutions for analyzing overtime on a weekly basis.
To balance out workdays on which the employee did not work enough and
days on which he or she worked overtime, operation BITQU generated a
batch input session. The batch input session had to be processed after
the first run of time evaluation to generate a correction quota. The
final overtime hours were determined in a second time evaluation run.
This method has now been replaced by a simpler and more flexible solution. There are two new standard methods of processing:
- Schema TPOW: Sample solution for weekly analysis of overtime
- Schema TPOP: Sample solution for two-weekly analysis of overtime. You
can use this schema if you want to carry out an analysis of overtime
for a general period other than the employee's working week or for periods of your choice.
The new methods offer the following advantages over the previous method:
- The final results are calculated during one run of time evaluation,
without the intermediate step of generating a batch input session.
- A weekly analysis of overtime can be carried out even if time
evaluation is only simulated (for example, in Shift Planning or for the quota overview).
- Using the new operation SUM, you can easily modify the sample schemas to carry out an overtime analysis for other periods.
Effects on Customizing
If required, replace the old method of determining overtime in your customer schema with one of the new methods:
- If you want a weekly analysis of overtime, insert schema TPOW in your schema. For more information, see
Analyze Overtime on a Weekly Basis
. Schema TPOW is not active in the standard schema TM00.
The previous methods for determining weekly overtime (schemas TOW0 and
TOW1) have been removed from standard Customizing, but they can still be used.