Show TOC

Improved Weekly Overtime Analysis

Scope of Functions

In time evaluation using the standard schema TM00, subschemas TOW1 and TOW2 previously provided sample solutions for analyzing overtime on a weekly basis.

To balance out workdays on which the employee did not work enough and days on which he or she worked overtime, operation BITQU generated a batch input session. The batch input session had to be processed after the first run of time evaluation to generate a correction quota. The final overtime hours were determined in a second time evaluation run. This method has now been replaced by a simpler and more flexible solution. There are two new standard methods of processing:

The new methods offer the following advantages over the previous method:

Effects on Customizing

If required, replace the old method of determining overtime in your customer schema with one of the new methods:

The previous methods for determining weekly overtime (schemas TOW0 and TOW1) have been removed from standard Customizing, but they can still be used.