In this step, you can set up an analysis of overtime for a general period. If too much overtime has been generated, you can cancel it at the end of the general period.
You can thus carry out an overtime analysis for the following periods:
An employee has approval to work 2 hours of
overtime each day and has a planned working time of 40 hours each week.
Overtime should only be generated if the employee works more than 80 hours
within two weeks.
The employee works for 9 hours on two days of the first week, 7 hours on one
day of the second week, and 8 hours on the remaining days. One hour is
deducted from the overtime for the deficient planned working time. The
employee is therefore compensated for one hour of overtime.
In the SAP standard delivery, the analysis in the above example is set up in subschema TPOP. The subschema is not contained in the standard schema.
The planned working time within the overtime period being analyzed must be specified in Customizing or calculated in the schema.
The options are as follows:
You can access all of the above values in time evaluation using operation HRS.
The analysis periods must be defined. You can query the relative days and the first and last days of a period in a personnel calculation rule using operation VARST.
In the SAP standard delivery, the above two-weekly analysis of overtime is set up in subschema TPOP. The subschema is not contained in the standard schema.
If you require an analysis of overtime for a
time frame other than
weekly (SAP standard schema TPOW) or two-weekly (SAP standard schema TPOP),
carry out the following steps: