Define Daily
Work Schedules
In this step, you define daily work schedules
for your enterprise. By entering the planned working time, the system
calculates the planned planned hours for one day, taking the break schedule
into consideration.
You also define daily work schedules for
availability in this step. For more information, see
Determine Daily Work Schedules for Availability .
Example
- Employees in your enterprise who work the day
shift on Monday work from 8:00 a.m. to 4:45 p.m. The work break schedule
includes a 45-minute break. Thus, the resulting number of planned working
hours for this day 8 (basic variant of the daily work schedule). You call this
daily work schedule DAY1. On Friday, the same day shift only works from 8:00
a.m. to 2:30 p.m., including a 30-minute break. The work schedule for Friday
is a variant of the daily work schedule DAY1. Call this daily work schedule
DAY with variant A.
- Different wage types should be generated for
daily work schedules that define a rotating shift. Group together the daily
work schedules defining a rotating shift to the same daily work schedule
class.
Requirements
- You have created work break
schedules.
Standard
Settings
The standard SAP System contains a number of
sample daily work schedules including those for rotating shifts and
flextime.
Recommendation
- Use the SAP sample daily work schedules as
your base, and call up online help for assistance with any of the individual
fields.
- If you intend to use time evaluation, it is
advisable to assign the same daily work schedule class to daily work schedules
that you want to process similarly.
Activities
1. Copy a
suitable daily work schedule from the SAP samples.
2. Change the
copied daily work schedule to reflect your desired daily working
time.
3. Enter
a
4. In the
Daily work schedule field, enter the following
data:
- ID for the daily work schedule
- Name of a variant if the daily work schedule
is a variant of an existing one
- Applicable name for the daily work
schedule
5. In the
Planned working hours field, enter the working time
that an employee has to work each day.
By entering the working time, the planned working hours are calculated by the
system. Paid break times are added and unpaid breaks are
deducted.
6. Select the
Planned working hours = 0 field if this daily work
schedule reflects a non-working day.
7. If you want
to create a basic variant of a daily work schedule, you can enter a rule
number or name for a daily work schedule selection rule in the
Daily work schedule selection rule field, from which the daily
work schedule variants are determined.
8. Enter the
desired working time using one of the following definitions of working
time:
a) Fixed
working time
b)
Flextime
- Enter the times you want to use to calculate
the planned working hours in the Normal working time
field. No entries should be made here for other daily work
schedules.
- Enter up to two core times in the
Core time 1 and Core time 2
fields.
c)
Breaks
- In the Work break
schedule field, enter the break schedule containing your desired
break times.
d) Tolerance
times
- In the Start of
tolerance and End of tolerance fields,
enter the tolerance times if postings within a given tolerance timeframe
should be adjusted to the start or end of planned working time in time
evaluation.
9. Enter a
valuation.
You can use the Minimum working time,
Maximum working time, Compensation
time and Additional hours fields in
the personnel calculation rules in time evaluation.
1. Classify the
daily work schedule for time wage type selection or time evaluation using a
value from 0-9.
Based on the work schedule class, you can then specify special regulations in
time wage type selection or time evaluation.
2. Select the
Automatic overtime if you want working time that
exceeds the specified planned working time to be valuated as overtime in time
evaluation.
The personnel calculation rule T015 calculates overtime in time
evaluation.
3. If you use
the Overtime infotype (2005), you can use the Reaction to
overtime and Reaction to overtime in core
time fields to set reaction indicators for flextime daily work
schedules.
Further
Notes
- You only need to use the use the
Normal working time and following fields if you run time
evaluation and want to set up a flextime model. If this is the case, then
enter a working time frame in the Planned working
time field and the standard working time in the
Normal working time field.
- First specify the basic variant of a daily
work schedule, by leaving the Daily work schedule
variant field blank and then entering the name or number of a
rule in the Daily work schedule selection field. If
the daily work schedule is a variant of an existing one, enter the name of the
variant (such as "A") in the Daily work schedule variant
field. Make sure you use the variant names that are defined in the following
step by the daily work schedule selection rules.
- The Maximum working
time, Compensation time, and
Additional hours fields are not used in the standard SAP
System.