Define Daily Work Schedules

In this step, you define daily work schedules for your enterprise. By entering the planned working time, the system calculates the planned planned hours for one day, taking the break schedule into consideration.

You also define daily work schedules for availability in this step. For more information, see Determine Daily Work Schedules for Availability .

Example

Requirements

Standard Settings

The standard SAP System contains a number of sample daily work schedules including those for rotating shifts and flextime.

Recommendation

Activities

1. Copy a suitable daily work schedule from the SAP samples.
2. Change the copied daily work schedule to reflect your desired daily working time.
3. Enter a
Personnel subarea grouping for daily work schedules.
4. In the Daily work schedule field, enter the following data:
5. In the Planned working hours field, enter the working time that an employee has to work each day.
By entering the working time, the planned working hours are calculated by the system. Paid break times are added and unpaid breaks are deducted.
6. Select the Planned working hours = 0 field if this daily work schedule reflects a non-working day.
7. If you want to create a basic variant of a daily work schedule, you can enter a rule number or name for a daily work schedule selection rule in the Daily work schedule selection rule field, from which the daily work schedule variants are determined.
8. Enter the desired working time using one of the following definitions of working time:
a) Fixed working time
b) Flextime
c) Breaks
d) Tolerance times
9. Enter a valuation.
You can use the Minimum working time, Maximum working time, Compensation time and Additional hours fields in the personnel calculation rules in time evaluation.
1. Classify the daily work schedule for time wage type selection or time evaluation using a value from 0-9.
Based on the work schedule class, you can then specify special regulations in time wage type selection or time evaluation.
2. Select the Automatic overtime if you want working time that exceeds the specified planned working time to be valuated as overtime in time evaluation.
The personnel calculation rule T015 calculates overtime in time evaluation.
3. If you use the Overtime infotype (2005), you can use the Reaction to overtime and Reaction to overtime in core time fields to set reaction indicators for flextime daily work schedules.

Further Notes