Preference Determination 

Use

Preference determination ascertains the proof of origin for goods produced in-house. Using a bill of material, the system evaluates the components purchased from a vendor that are used in an in-house manufactured product to determine whether they are originating or non-originating. Preference determination can be performed for individual materials or collectively for a group of materials.

The preference indicator in the material master record can be changed by the results of the preference determination calculation. After the system performs preference determination successfully, it records the preference ID and the date of preference determination in the material master record. Only ID B (qualifies for preference) can be updated automatically. Condition records containing the determined preference price are created for the material and preference zone.

The function also calculates a price by using existing preference agreements between individual preference zones and preference rules defined for these areas. This price is called the preference price. The function stores the preference price in a condition record, defined for a preference zone and a product. The standard condition type is called PREF.

The system takes the condition records into consideration during pricing in the sales order. The system compares the sales price of material with the preference price stored in the condition record. The product to be exported must reach the preference price during sales order processing if it is to be considered by the customs authorities as authorized for preference. The system indicates whether an order item qualifies for preference in the item detail screen in the sales order and in the billing document.

Prerequisites

To perform preference determination for a saleable part or an in-house produced assembly, you must make sure the following prerequisites are fulfilled:

Bill of Material Explosion

The basis for preference determination is the bill of material. This bill of material must be exploded. The explosion enables the program to perform preference determination for all components. When you explode the bill of material, you note the following:

After explosion, all the exploded bill of material items are displayed. In the case of errors, processing is terminated and a note is issued. You can also check bills of material for alternative items. See Preference Determination for Bills of Material with Alternative Items.

How the Bill of Material is Processed

The material value for the bill of material components is calculated as follows:

Bill of material items, such as text items that are not relevant for preference determination, are not passed on to the calculation stage.

Only material bill of materials (type M) can be processed in preference determination. The bill of material type is checked at the beginning of preference determination.

Features

You execute individual and collective preference determination from the Calculation section of the Preference Processing Cockpit.

Individual Determination

Individual determination can be carried out for new materials on-line if there are not too many components in the corresponding bill of materials (BOM).

Collective Determination

Collective determination is generally performed in the background every three months, depending on the agreements that have been made with the appropriate authorities.

Additional Information

Fields in these reports that need further explanation include the following:

In general, the assumption is made that tariff alternation is carried out with the first four numbers of the commodity code. You can change this specification in the ‘tariff alternation’ parameter. Changing this specification is necessary in areas such as preference determination for NAFTA, which requires alternation for the first 6 digits. In Customizing, you can define deviating tariff alternations by commodity code or by ranges of commodity codes. If the table remains empty, then only the parameter specification is valid.

Select this option if you are working with assemblies for which preference determination has not yet been performed.

If you have selected this field, preference determination can be simulated. The real preference determination run, which updates the preference data, is only carried out after the log has been checked and processed.

Result of Determination Run

As a result of the determination run, the system

Activities

The system records the results of individual and collective determination in the spool file. This file serves as documentation in case of a customs inspection or external audit.

Another result is that the corresponding material master is based on the preference situation.

One more result is significant for sales and distribution processing: condition records are created for each preference zone, plant, and material number. These condition records can be used in a sales and distribution pricing procedure to establish whether a particular item is authorized for preference.