Show TOC
Define and Set
Up Control Recipe Destinations
In this IMG activity, you make the following
settings for the
control recipe destinations you want to use in your
plant:
- You define the control recipe destinations
with their addresses and add the following additional information if
required:
- Information on the type of signature used in
PI sheets (for example, signature with password check or
signature)
- Data that controls system performance during
PI sheet display
- Details on the sequence in which
material-related process instructions are generated in the process
order
- You assign the process instruction categories
that are suitable for this control system to control recipe destinations of
type external control system.
- You specify the process instructions that are
to be generated in the process order when a control recipe is created for a
control recipe destination.
Control recipe destinations are assigned to the
phases of the
master recipe and the order. In the process order, one recipe is
created and sent for each control recipe destination assigned to the
order.
Activities
3.