This section contains configuration options related to structured materials.
The activities listed can influence the master data maintenance of component lists and influence how the system responds in the logistical process.
The activities mainly originate from Sales and from Production. The settings in the standard system should not normally be changed. Particularly in Production (Customizing for BOMs), there are numerous configuration options that cannot and must not be used for structured materials because the component lists are not real bills of material (BOMs). For this reason, you should carry out these activities only if there are problems, and carry out these activities only in the way described, and make changes with extreme caution.
The explosion of structured materials and empties BOMs in sales orders is controlled by item categories. The item category is proposed on the basis of the item category group for the material (-> Assign Item Categories). By configuring the item category (-> Define Item Categories), you can define whether an explosion takes place ( structural scope and also the relevant application ). A priority sequence is assigned to the application in Customizing for BOMs (-> Define Applications). This priority sequence (-> Define Priority Sequence for BOM Usage) must contain the BOM usages for Retail (-> Structured Material Maintenance).
Stock postings for empties are only made if you have carried out the activity Activate Empties Processing .
If, when creating component lists for structured materials or when creating empties BOMs, you encounter problems caused by incorrect Customizing, you can check the following activities:
In addition, the following problems can be caused by incorrect Customizing:
Define BOM Statuses. In
Define Default Values, you define the default BOM statuses that
BOMs have.In Structured Material
Maintenance, you define which item categories are received by
the components of structured materials or the components of an empties BOM. In
Define Item Categories, ensure that material entry is
allowed and that the +/-
sign for component quantity may be positive.
If you also want to use units of measure other
than the base unit of measure in empties BOMs, you must create a separate
dimension containing the required units as units of measurement. You do this
in
Check Units of Measurement. The dimension and also the
units of measurement that you assign to it must not already exist in the
system.