Show TOC

structural scope

Procedure

Make an entry here to indicate how a bill of material is processed in a sales order involving this item category.

When you are using

configurable materials , the structure scope determines whether it is possible to configure the material in the sales document. In the item category, you must enter either C or D as the structure scope for configurable materials.

Example

You can specify the extent to which non-configurable materials should be exploded in the sales order, that is, the level up to which subitems should be created for the bill of material components.