Show TOC
Assign
Templates to Cost Objects
In this step you specify how the templates for
the calculation of the process costs are selected. Because the list of
possible processes can be valid for multiple materials and orders, the
template is selected through a
costing sheet and an
overhead key , rather than through the material being
manufactured.
- The costing sheet determines the conditions
for calculating overhead rates, and is usually selected through the
valuation variant . This link means that process costs should be
calculated in addition to overhead rates.
- The overhead key is selected through the
overhead group specified in the costing view of the
material master record. Through the combination of overhead key and costing
sheet you can select a template in dependency on the material.
Because templates can be used in many different
areas of Controlling, you must specify the environment (such as material cost
estimate or Cost Object Controlling) in which the template can be
used.
Requirements
You have performed the following
steps:
Activities
To define the template
determination:
1. Choose
New entries.
2. Enter the
following data:
3. Save your
entries.