Defines how values posted in the R/3 System are
calculated.
A costing sheet consists of one or more of the
following lines:
These contain the
amount or quantity on which the overhead is calculated.
These contain the
percentage rate to be applied to one or more base lines.
These contain the
sum of the base amount and calculated amounts.
Costing sheets are used in the following
components:
- Overhead Orders (CO-OM-OPA) and Product Cost
Controlling (CO-PC), where they are used to calculate overhead
- Profitability Analysis (CO-PA), where they are
used to calculate anticipated values
- Overhead Cost Controlling (CO-OM), where they
are used to calculate resource prices