Show TOC

costing sheet

Controlling (CO)

Defines how values posted in the R/3 System are calculated.

A costing sheet consists of one or more of the following lines:

These contain the amount or quantity on which the overhead is calculated.
These contain the percentage rate to be applied to one or more base lines.
These contain the sum of the base amount and calculated amounts.

Costing sheets are used in the following components: