Creating PIRs with Reference 

Prerequisites

You must have performed planning procedures and have results to use as reference. You can choose from the following reference types:

Procedure

  1. To create planned independent requirements using a reference, on the Demand Management screen, select Planned indep.reqmts ® Create.
  2. The screen for creating planned independent requirements appears.

  3. Enter the material number, the name of the product group or the requirements plan.
  4. Enter the plant and / or the material (see Material Requirements Planning).
  5. Enter the version.
  6. Choose Reference.
  7. The Copy Reference dialog box appears.

  8. Select a reference type.
  9. Continue with the next steps for copying the reference types are described in the following sections:

Copying Standard SOP Results for Product Group

Copying Standard SOP Results for Material

Copying the Forecast

Copying Flexible Planning

Copying Simulative Dependent Requirements

Copying Planned Independent Requirements

Copying the Original Plan