Changes to the Bill of Material 
Use
Changes to pieces of equipment or materials are sometimes necessary for technical or economic reasons. Technical changes may be necessary, for example, to remove technical errors or to enforce new environmental regulations or safety requirements. Economic reasons for a change to a bill of material could be, for example, when cheaper material is introduced or customer requirements are taken into account.
Features
Changes are possible with and without a history.
For more information on how to see the changes that have been made, see
If you want to change a BOM using a history, you must first enter a change number before doing so. Both the changes and the change number are documented by the system. They are valid from the date that has been specified for the change number. By entering the change number you are identifying the change master record stored under this number. The change master record is managed in the Plant Maintenance (PM) System by the Engineering Change Management function.
For more information on how to see the changes that have been made, see
For more information on Engineering Change Management, refer to the SAP documentation PP - Engineering Change Management.