Posting Components Goods Issue for Production Order 
Use
You need three components to produce bearing box T-20600. You post this from the project stock for the production order
Procedure
Menu Path |
From the Production node, choose Shop Floor Control ® Goods Movement ® Goods Issue. |
Transaction Code |
MB1A |
Field |
Data |
Plant |
1300 |
Storage location |
0001 |
Field |
Data |
Order |
<Your production order number> |
The goods issue for the three components required to produce T-20600 is posted.
Result
The goods issue is posted. This leads to the WBS element T-10## being credited. The project stock is now reduced to zero.
Switch to session three Stock/Requirements or call up the current
Stock/Requirements List again. To evaluate the current data, chooseThe components are taken from the project stock via the goods issue for the order. At the same time, the production order is debited using a consumption cost element, and the stock value of the WBS element is reduced accordingly using cost element 79000 Unfinished Products. As the production order is assigned to the WBS element, the actual costs from the production order are displayed on the WBS element.
Go to session 2 Cost Report. To evaluate the current data, call the
Cost Element Report again.