Creating Standard Networks 

  1. Materialkomponenten zum Standardnetz zuordnen
  2. Vorgängen Vorlagentexte zuordnen
  3. From the main menu select the menu options Accounting or Logistics ® Project management ® Basic Data.
  4. Select Standard structures ® Standard network ® Create
    The initial screen is displayed.
  5. Enter:

If you do not enter a key, the system generates a number for the standard network.

The key date determines when the standard network becomes valid. The default value is today’s date.

If you enter a key date that lies in the future, you must enter this date, or a later one, every time you change the standard network. The changes only come into effect as of the key date.

  1. Choose Enter.
  2. The system displays the standard network header, which contains data that is valid for the entire standard network.

  3. Enter relevant data, such as a standard WBS element, to create a link between the standard WBS and the standard network.
  4. Use the Goto menu to enter data for the standard network.
  5. Activities

    Maintaining Relationships Between Activities

    Allocating Materials to Activities

    For information on enhancements for customer-specific fields in standard networks, refer to Project System Customizing.

  6. Save.

You can use an existing standard network to create other standard or operative networks. All data from this standard network is copied into the new (standard) network, which you can overwrite. However, once you have saved your new (standard) network any subsequent changes to the original will not be copied.