Use
You use this procedure to create a worklist for production version editing. Depending on your requirements, you make the required changes in mass processing or individual processing, this means, on the table-like overview of the worklist or on the detail screen of a specific production version. If a master recipe has been assigned to your production versions as the detailed plan, you can navigate to the recipe from mass processing to edit the recipe or bill of material (see
Editing Recipes from Production Versions).See also:
Creating Production Versions in the Material Master Records
You can use this function to edit individual production versions. Note, however, the restrictions described in the corresponding sections.
Prerequisites
The material for which you want to edit production versions has been created in your plant.
Procedure
If you need more selection criteria, choose
to branch to the selection screen, enter the criteria, and choose
.
The
icon is displayed in a different color to indicate that additional selection criteria have been entered.
.The system creates a worklist with the production versions that match your selection criteria and displays them in a table-like overview.
As a rule, production versions are ready for input. The
icon indicates exceptions that are not ready for input in the overview. This may be due to the following reasons, for example:
If required, evaluate the selection log.
Function |
Edit on |
Procedure |
Create |
Overview |
Enter the data of the production version in a new line and choose Enter. |
Detail screen |
| |
Copy |
Overview |
|
Assign change number |
Overview |
|
Change |
Overview |
Change the data in the corresponding line and choose Enter. |
Detail screen |
Double-click a production version to branch to the detail screen. Make the desired changes there. | |
| Check consistency |
Overview |
Select the production versions you want to check and choose The system displays the check results and updates the check status of the production version together with the date of the last check. |
Detail screen |
Double-click a production version to branch to the detail screen and choose The system displays the check results and updates the check status of the production version together with the date of the last check. |

You can also perform the consistency check for production versions that are only displayed. The system, however, does not update the check status and date of these production versions.
Function |
Edit on |
Procedure |
Lock |
Overview |
Choose the corresponding entry in the Lock field. |
Detail screen |
Double-click a production version to branch to the detail screen and choose the corresponding entry in the Production version group box in the Lock field. | |
Delete |
Overview |
Select the production version you want to delete and choose |
The system displays the following icon in the Processing status column on the overview screen of the worklist for edited production versions:
for production versions you have just created or copied
for production versions whose data you have changedThese icons indicate that changes have been made but not saved. The production versions are locked for other users.
. The system saves the edited production versions and unlocks them. It deletes the icons in the Processing status column.

If several users access the same data, another user may be changing a production version after you have created your worklist. If you make changes to the same production version, the system will not let you save them.
For this reason, we recommend reading the data from the database again every time you save. Choose
to do so.