Evaluating the Goods Receipt in the Cost Element Report 

  1. Switch to session two or call up the cost element report.
  2. Evaluating Costs in the Cost Element Report

    In the Unfinished Products row, the system displays a stock value for WBS element T-10###. The commitment is reduced to zero.

  3. To call up the line item report, select the value in the Stock column, and choose .
  4. To display the document, select a row and choose Document.
  5. The material document appears.

  6. Choose , until the Cost Element Report appears.
  7. Change session.