Scheduler

Definition

The performance metrics related to the activities of the internal SAP CC schedulers

Technical Data

Consider the technical information about this metric subnode in the metric hierarchy:

Software Product and Version SAP Convergent Charging 4.1
Path SAP Convergent Charging | SAP CC | Scheduler

Description

This node groups the performance and health data that relates to some technical or business activities scheduled in the SAP CC system.

An SAP CC Core Server system includes some specialized schedulers to process data regularly. There is a subnode for each scheduler enabled in the system. You work with the 'Average Response Time (ms)' metric that allows you to monitor the execution times of the internal schedulers.

Notes

  • The scheduler activities depend on the system configuration. Some schedulers may be disabled in your SAP CC system. Consult the Scheduling settings in the SAP CC System Parameter Reference.
  • Some activities are scheduled by external systems depending on the implementation and customizing. The current node does not reflect the corresponding activity.

Schedulers

The available schedulers are:

Business features:

  • Activation scheduler
  • Expiration Alert scheduler
  • Refresh scheduler
  • Purge Allowances scheduler
  • Transport scheduler

Technical features:

  • SLD scheduler to update the installation information in the System Landscape Directory (SLD) system
  • Metric scheduler
  • Cleanup scheduler

Note

There is no metric defined in SAP CC at this level. Consider the subnodes in the metric hierarchy.

Monitored Application Data

The possible subnode is:

Additional Information

System configuration: For more information about the system configuration parameters, consult the SAP CC System Parameter Reference and SAP CC Configuration Guide.