Use
This function enables you to assign several specifications to a report. The report is then generated for a particular specification and can then be used in report shipping for that specification and all assigned specifications.
The number of reports required in the SAP System is thus reduced.
Features
However, changes are not entered automatically in all existing report versions.
If specification data for a specification assigned to a report is changed, an entry is not automatically made in the worklist. You must check if the assigned report fits with the changed data.
You must also check if the assignment is valid if you change the specification for which the report was generated.
Assignment of a Number of Specifications to One Report
Activities
Assigning Specifications to a Report