Log Message: com.sap.SCC.core_client.000034

Message (WARNING)

Syntax

The validity period of the newly created allowance is postponed by the system for the allowance plan [{allowancePlanId}] with the subscriber account [{suacId}] and the provider contract [{contractId}] because an allowance cannot be renewed more than once per day.

Legend
{suacId}:
The subscriber account ID
{contractId}:
The contract ID
{allowancePlanId}:
The allowance plan ID

Severity

Warning

Detailed Information (APPS_COMMON Log)

The system postpones the validity period of the new allowance to the validity start date of the expired allowance plus 1 day (Gregorian Calendar).

Possible Impacts

If the validity period of the expired allowance is lower than 1 day, a time interval can separate the 2 allowances.

Next Steps (Troubleshooting)

This section provides you with some troubleshooting operations to identify the correction actions to be performed. In a production system landscape, contact your SAP Support Team for each fatal error message in the logs.

  • To avoid discontinuities in the allowance chronology, modify the allowance logic to ensure that the validity period is greater than or equal to 1 day.
  • Archive the log and trace messages.

SAP User Experience

Enrich your SAP user experience and join our community of professionals:

Recommendation

SAP provides you with the SAP Community platform. You can benefit from a wide range of technical and business guidance from a community of experts and share knowledge and your best practices.

You cannot find the answers you are looking for? Contact our community of experts. Share your SAP user experience and feedbacks.

Share your symptoms or step-by-step resolutions to a wide range of problems that may occur in your work with SAP Convergent Charging.