Syntax
The root charging contract with the ID "{chargingContractId}" cannot be modified because its operational status is set to locked or closed.
The meaning of this error cause message depends on the software layers and internal architecture of the SAP CC systems. See the note to adapt the terminology to the concepts and data models you work with.
Set the operational status of the root charging contract to active first, and then modify the root charging contract.
Verify your changes.
Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.
This error code is valid from SAP CC version number 4.0 SP08 to the software version that this documentation refers to. For newer versions, consult the relevant documentation.